A case study about our expertise at work in the Media and Entertainment sector
A senior consultant at Power Management Design and Build was called in by the Royal Opera House to work alongside their prime contractors Ove Arup and Schneider Electric.
The project was well advanced and the opening night was quickly approaching but sign-off by the distribution network operator (DNO) could not go ahead without an intervention that they deemed necessary.
By identifying the pre-load characteristics and by supplying and installing the proper remedial equipment, Power Management Design and Build consultants were able to assemble a team to work across weekends with just two shutdowns.
As a result the stage lighting was approved for operation by EDF.
"Your work assured the re-opening of the Royal Opera House could go ahead on time," said Mark White, Regional Manager at ETC Ltd.
Video is included for illustrative purposes only. Power Management Design and Build cannot be held responsible for content held on external websites.